BIM Admissibility Diagnosis

Does that document require BIM? and you don't know if you can fulfill it?

We'll tell you if your proposal meets the BIM requirement of the tender specifications, exactly what you're missing, and how to fix it. Before you risk losing the bid.

Request a free diagnosis Free during launch · Response within 24 business hours

Since when is BIM mandatory in public tenders?

0 M€ BIM requirement threshold in public works

From the January 1, 2026, Public works contracts starting at €2 million require BIM requirements. It's not a scoring criterion: it's a access condition. And the tender documents don't always ask for what they seem to.

The BIM Plan in public procurement sets these thresholds, and the wording of each tender translates the applicable level to deliverables, roles and processes aligned with ISO 19650. That is where admissibility is decided.

Initial BIM Level2 – €5.4M
Intermediate BIM Levelmore than €5.4 million

What exactly do I receive?

You receive an admissibility report that answers three questions about your application.

01

What does the tender require?

The BIM requirement translated into verifiable conditions, according to the applicable level and ISO 19650 processes.

02

What are you celebrating today and what aren't you celebrating?

Compare point by point between what is required and your current ability, without gray areas.

03

What do you need to resolve?

The pending actions with scope and deadline, to present yourself without risk of exclusion.

Conditions. A specific document and its submission date are required. We analyze a limited number of documents per week, in order of arrival.

Standard. The diagnosis follows the same documentary standard with which we execute the projects: EIR, BEP and information protocols according to ISO 19650.

The diagnosis follows the documentary standard with which DOTA executes its projects: EIR, BEP and information protocols according to ISO 19650.

This is what our work looks like.

Three outputs from the same model: coordination, resolved interferences, and reliable measurements.

Modelo federado en BIM con arquitectura, estructura e instalaciones Detección de interferencias en BIM: colisión marcada en rojo Planos y mediciones extraídos del modelo BIM

No. It is written for technical management and executives, not for modelers.

No. The report is yours and you can run it with whomever you want.

Enter the deadline in the form and we will confirm within 24 hours if we can meet it.

Because it's our way of showing you how we work before you decide who to partner with. No commitment, no fine print.

Frequently Asked Questions

How do I request a diagnosis?

Send us the specifications and the deadline. We'll confirm within 24 hours if we meet it.

Free during launch Response within 24 business hours The report is yours, no obligation.

DOTA Oficina Integral SL · ISO 19650 Methodology · We process your data only to respond to this request.








    Scroll to Top